Overview of Onsite Progress
                  Jian-ping Chen
      g2/Gep Collabroation Meeting
REGION1
REGION 2
REGION 3
REG 4
REGION5
Slow Raster
FZ1
FixedStand
FZ2 TelescopingStand
DUMP
TARGET
Polarized Solid NH3 Target (Hall C/UVa target)
     Target material irradiation
Beamline (Similar to Hall C)
    Magnetic Chicane/Beamline modifications.
    Low beam current BCM/BPMs
    Slow Raster
Hall A Engineering/Design
    Local Beam Dump
    Hall Infra-structure
    Scattering Chamber/ Target/magnet mount
    Septum Magnets
Simulations/Optics/Spectrometer/Detectors/QAD…
BPMs
Use existing equipments
     Hall C beamline/target
Keep change minimum
     modify the existing PREX septa
     use simple local beam dump
          Major equipments for g2p/GEp experiments
Septa/HRS
Significant Progress in Beam Line System (T. Michalski, B. Dillon-Townes)
       Overview conceptual design completed
       Region 1 and Region 2 design drawings completed
       Region 3 main items identified and detail design on-going
       Existing hardware items (magnets, raster, power supplies) located
       New items (BPM electronics, Harps, BCM, BD magnets, …)
Target Progress (C. Keith/ D. Crabb)
      Conceptual design
      Rotating seal
      Pumps ordered
      New fridge at UVa tested (along with existing target materials and other systems)
            need to manufacture one fridge at JLab
      Target material irriadiation: will do it at NIST
      Magnet is being shipped from Oxford back to JLab?
Hall A infrastructure, Beam dump, Septum (A. Gavalya, R. Wines)
      Setup at the pivot area for the target
      Beam dump
      Septum
      Scattering chamber/ layout/ interferences
3rd Arm for polarization monitoring
Simulations
Overview of Progress
k2.jpg
3.3 GeV, 12.5 deg
2.2 GeV, 15 deg
3.3 GeV, 6 deg
2.2 GeV, 6 deg
1.6 GeV, 6 deg
1.1 GeV, 6 deg
Polarized beam: 50-130 nA
up to 5 uA? for optics, 30 uA ? for Compton
Polarized NH3 target
Slow Raster 25 mm diameter
Gep  configuration is now basically
g2at the elastic setting
Two configurations: with septa (6 degree)  (target at 87 cm upstream)
and without septa (12.5 and 15 degrees) (target at original pivot)
g2p needs target at 90 degrees for all and 0 degree for 3.3 GeV
GEp needs target at 80 degree
Kinematic Settings (Last Meeting)
3.3 GeV, 12.5 deg
2.2 GeV, 12.5 deg
3.3 GeV, 6 deg
2.2 GeV, 6 deg
1.6 GeV, 6 deg
1.1 GeV, 6 deg
Polarized beam: 50-130 nA
up to 1 uA for optics, (also for Compton?)
Polarized NH3 target
Slow Raster 20-25 mm diameter
Gep  configuration is  basically
g2at the elastic setting
Two configurations: with septa (6 degree)  (target at 87 cm upstream)
and without septa (12.5 and 15 degrees) (target at original pivot)
G2p : target at 90 degrees for all and 0 degree for 3.3 GeV
GEp : target at 20 degree?
Kinematic Settings (Now)
kin.jpg
 Cost, mostly consistent with initial estimation, some increase due to new items
A)  Beam line procurement: 14 BMP electronics
                                                           harps (can not use the existing French harps)
                   Beam line manpower: the two items above + software group
             B) Target group estimation, procurement increased from 80 K to 140K.
 FY11, continuing resolution
             addition funding from DOE (promised) not here yet.
 User pledged contribution to procurement :  $ 80K
                            to Engineering/Installation:   ?
                                                             Total:  $140K
       Will need user to honor the pledges.
 
 Manpower cost will be supplied from within JLab.
        Need help from user manpower
 
Budget and User Contributions
Questions and Issues
  Should we do Compton with 1 uA, straight-through, how many times?
  How should we do optcis study-? What optics target(s)  should we have?
  How to do the polarization monitoring (3rd arm)?
  Should we do a field map at EEL?
  Should we add some iron plates to study the effect?
  Should we and how to measure field direction?
  Should we do a field map in Hall A (combining target/septa)?
…?
Onsite User/Hall A People Power
 PhD Students:
      Pengjia Zhu (USTC, advisor: Yunxiu Ye), 3rd year, onsite, (beamline, target)
      Min Huang (Duke, Haiyan Gao), 3rd year, onsite, (simulation, optics)
      Chai Gu (UVa, Nilanga Liyanaga), 2nd year, onsite from 2/2011
      Melissa Cummings (W&M, Todd Averett), 2nd year, onsite from 5/2011
      A student from Temple (Zein-Eddine Meziani), 2nd year, onsite from 5/2011?
      Name? (New Hampshire, Karl Slifer), 1st year, onsite from?
      ?
 Postdocs:
     Kalyan Allada (Hall A), beamline, 3rd arm
     Jixie Zhang (Hall A): simulation, optics
     Xiaohui Zhan (Argonne) (onsite from 2/2011), target?
     Narbe Kalantarians(UVa): target
     Hovhannes Baghdasaryan (UVa) ?
     Sarah Philips (New Hampshire) ?
     ?
 Physicists:
    Jian-ping Chen (Hall A): Project manager, overall coordination
    Alexandre Camsonne (Hall A): Beam line, DAQ, …
    Karl Slifer (New Hampershire): Overall consideration, run plan, …
    Doug Higinbotham (Hall A) (will be more available after SRC experiments?)
    Guy Ron (LBNL)?
    ?