Challenges in Using Paramics in a Secondary PlanStudy – Case Study of Downsview, Toronto
Paramics Users Group Meeting
October 5, 2009
AECOM_CMYK
Overview
Background
Existing Conditions
Future Traffic Demands
Future Model Scenarios
Challenges
Discussions
2
AECOM_CMYK
Study Background
Secondary Plan Update involving:
Land Use and Urban Design Plans
Transportation Assessment
Servicing
Secondary Plan Update to harness a new subway linethat will run through the plan area.
Paramics model used to develop and evaluate thenetwork alternatives and identify preferred option
3
AECOM_CMYK
Study Area Context - City of Toronto
4
http://tile22.mqcdn.com/map/Scale154950/1/63/0/633.gif
http://tile23.mqcdn.com/map/Scale154950/1/64/0/634.gif
http://tile23.mqcdn.com/map/Scale154950/1/63/0/634.gif
http://tile22.mqcdn.com/map/Scale154950/1/64/0/633.gif
http://tile24.mqcdn.com/map/Scale154950/1/63/0/635.gif
http://tile24.mqcdn.com/map/Scale154950/1/64/0/635.gif
AECOM_CMYK
Study Area / Issues
5
Future subway extension
to York University
Future intermodal station
AECOM_CMYK
Study Background - Issues
Opportunity/Constraint
Details
Physical Constraints
Bombardier Runway
North south CN Railway line
Federal Parkland
Policy & Operational Constraints
Existing roadways at capacity
No widening of surrounding arterials
Planned TransportationImprovements
New subway line
TransitCity- LRT line on Finch Avenue
New intermodal station for Regional (GOtrain) and subway line
6
AECOM_CMYK
Study Objectives
Issues to be addressed by modelling
Identify preferred network including lane requirements
Sensitivity analysis on specific network elements
Define timing/phasing of major (still underway)
Paramics Scenarios:
Existing Conditions
Over 50 Future 2031 scenarios representingalternative networks & land use permutations
7
AECOM_CMYK
Data Collection
Signal timing data available for the focus area only
Traffic volumes: - Turning movement counts (TMCs) atmajor intersections
Traversal matrices for 2006 and 2031 from the City’sdemand forecasting EMME model for AM peak hour
Floating car measurements of travel time alongsurrounding arterial sections
8
AECOM_CMYK
Study Area- Existing Network
9
Wilson Ave.
Keele St.
Sheppard Ave.
Finch Ave.
Jane St.
Bathurst St.
Dufferin St.
Allen Rd.
Focus Area
Sheppard
Ave.
Area: 6km wide by 4 km
Total demand: 35,000
Vehicles in
system: 4-5,000
AECOM_CMYK
Calibration and Validation
10
Undertaken through volume comparisons at screenline,link, intersection and turning movement levels;
Stochastic assignment method used
GEH statistic as well as % variation
Acceptable results achieved as shown below
# Datasets
AM
PM
Link Volumes
146
86%
85%
Intersection Volumes
27
78%
63%
Screen Line
6
100%
100%
AECOM_CMYK
Future 2031 Traffic Demands
Based on traversal matrix (AM) obtained from the City
Minor adjustments as applied for existing conditions
Trips from Downsview Park (Zone 98) replaced with tripgenerated from considered land-use
Adjustments for existing demands
PM demands assessed from AM and trip generation
11
AECOM_CMYK
Background Traffic - EMME Zoning System
12
AECOM_CMYK
land use plan
Recommended Land Use
Five land usescenariosdeveloped
Three consideredin analysis
Existing TMP
Recommended
13
Population: 19,575
Employment: 22,029
Units: 9,841
GFA: 1.4m (m2)
AECOM_CMYK
Summary  of Traffic Demands
14
Scenario
EMME Output
Generated
Final
Existing PM
36,992
-
36,992
PM 2031 – Existing Land Use
41,796
8,623
50,419
PM 2031 – New Land Use
41,796
10, 022
51,818
Land Use Scenario
AM Peak Hour
PM Peak Hour
In
Out
Total
In
Out
Total
Existing Plan
4,470
2,818
7,288
3,004
5,618
8,623
Recommended Land Use
5,205
3,360
8,565
3,514
6,508
10,022
Trip Generation
Total Paramics Demands
AECOM_CMYK
road 1
Network Options
Emerging Preferred
15
AECOM_CMYK
figure3_draft recommended road network_v3.jpg
Network Options – Preferred
16
AECOM_CMYK
Paramics Future Networks
TMP
Option 2
Emerging Preferred
Option 3
AECOM_CMYK
Paramics Future Network – Preferred
18
AECOM_CMYK
Measures of Performance – Intersection LOS PM
Intersection
TMP
Option 1
Option 2
Option 3
Preferred
Keele Street & Wilson Avenue
F
F
F
F
F
Sheppard Ave. & Keele Street
F
E
F
F
F
Finch Ave. & Keele Street
F
F
D
D
D
Dufferin Street & Wilson Avenue
D
D
D
D
E
Transit Road & Wilson Avenue
C
C
F
D
F
Wilson Heights Blvd & Wilson Avenue
C
C
D
D
C
Allen Road & Sheppard Avenue W
F
F
F
F
E
Transit Road & Allen Road
F
C
C
C
E
Finch Ave. & Allen Road
F
F
E
E
E
Sheppard Ave. & Wilson Heights Blvd
C
C
F
F
F
19
AECOM_CMYK
Measures of Performance – Arterial LOS
Street
Dir
TMP
Option 1
Option 2
Option 3
Preferred
Keele (Wilson toFinch)
 
NB
F
F
F
F
F
SB
F
F
F
F
F
Allen (Wilson toFinch)
 
NB
F
F
D
D
D
SB
D
D
C
C
C
Finch (Keele toAllen)
 
EB
D
D
F
F
C
WB
D
D
E
D
E
Sheppard (Keele toWilson Heights)
 
EB
F
F
F
F
E
WB
F
F
F
F
F
Wilson (Keele toWilson Heights)  
EB
F
F
F
F
F
WB
E
E
F
E
E
20
AECOM_CMYK
Measures of Performance
LOS does bring outsignificant differences
Use of screen shots toemphasize certainoperational aspects
Use of network basedmeasures to better showdifferences
21
AECOM_CMYK
Measures of Performance – Network Based
22
AECOM_CMYK
Measures of Performance – Network Based
This is measure of how much of the extra development demand could not be
loaded into the network based on output of Paramics release file
23
AECOM_CMYK
Measures of Performance – Video Clip
24
AECOM_CMYK
Lane Requirements – Based on Modelled Volumes
draft recomended road network_min 2 way laneeps_v4.jpg
25
AECOM_CMYK
Sensitivity Analysis
Allen Area Configuration – (A)
Transit Road Extension – (B)
Roadway Extension to Wilson(C)
E-W Roadway Extension toKeele (D)
Dufferin St. Extension (E)
C
B
D
A
E
26
AECOM_CMYK
Sensitivity Analysis
Area
Findings and Recommendation
A. Allen area
Alternative concepts developed, three feasible onesrecommended
B. Transit Road Extension
Extension should be maintained
C. Roadway Extension toWilson
Provide for improved traffic patterns, but could beomitted
D. East-West to Keele
An important east west roadway that should have 4lanes
E. Dufferin Street Extension
Provide for improved traffic patterns, but not critical
27
AECOM_CMYK
Challenges
Policy constraints requiring no widening of arterialnetworks made it difficult to develop road network
Need to communicate study findings clearly to “non-technical” persons necessitated use of uniqueperformance measures
Need to satisfy all requirements resulted in modellingmany scenarios. This was worsened by the need tocommunicate all findings in a way easily understood bynon technical persons
28
AECOM_CMYK
Discussions / Questions