Design Standards
1
Marshall Douberley
2012  UPDATE TRAINING2012  UPDATE TRAINING
Maintenance
of Traffic
Contact Information:
 Marshall Douberley
863-519-2382
marshall.douberley@dot.state.fl.us
 Earl Taylor
863-519-2231
earl.taylor@dot.state.fl.us
MOT  Tallahassee 129.JPG
Design Standards
2
2012 Design Standards2012 Design Standards
Summary of Major Changes
Effective July 1, 2012
Design Standards
3
Index 600 Sheet 3Index 600 Sheet 3
High-Visibility Safety Apparel
3
Shall meet ANSI/ISEA 2010 and 2004
– No changes to the Performance Class scheme
– Requirements for rainwear background fabric
– Changes related to design features
– Optional criteria for Flame Resistant items
– Guidance on service life of apparel
Design Standards
4
Index 600 Sheet 4Index 600 Sheet 4
4
6-7-2012 1-33-59 PM.png
Design Standards
5
Index 600 Sheet 4Index 600 Sheet 4
5
Removable Polymer Rumble Strip
3-14-2012 4-10-29 PM.png
Design Standards
6
Index 600 Sheet 4Index 600 Sheet 4
6
Removable Polymer Rumble Strip
P1010037.JPG
Design Standards
7
Index 600 Sheet 4Index 600 Sheet 4
7
Removable Polymer Rumble Strip
table.png
6-7-2012 11-17-43 AM.png
Design Standards
8
Index 600 Sheet 4Index 600 Sheet 4
8
Molded Engineered Polymer Rumble Strip
plan AM10.png
Design Standards
9
Index 600 Sheet 4Index 600 Sheet 4
9
Molded Engineered Polymer Rumble Strip
plan AM12.png
Design Standards
10
Index 600 Sheet 4Index 600 Sheet 4
10
Molded  Engineered Polymer Rumble Strip
table.png
6-7-2012 11-19-29 AM.png
Design Standards
11
Index 600 Sheet 4Index 600 Sheet 4
11
PLAN PREPARATION MANUAL
plan AM13.png
PAY ITEM
102-910- TEMPORARY RAISED RUMBLE STRIP SET
Design Standards
12
Index 600 Sheet 12Index 600 Sheet 12
12
Longitudinal  Channelizing Devices (LCD)
6-7-2012 11-32-53 AM.png
6-7-2012 2-34-37 PM.png
Design Standards
13
Index 600 Sheet 12Index 600 Sheet 12
13
Longitudinal  Channelizing Devices  (LCD)
\\dotsco375685\users\Benghuzzi\Construction\007.JPG
Vehicle Longitudinal  Channelizing Devices
Design Standards
14
Index 600 Sheet 12Index 600 Sheet 12
14
Longitudinal  Channelizing Devices (LCD)
6-7-2012 11-32-53 AM.png
6-7-2012 2-44-45 PM.png
Design Standards
15
Index 600 Sheet 12Index 600 Sheet 12
15
Longitudinal  Channelizing Devices  (LCD)
Pedestrian  Longitudinal  Channelizing Devices
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\MOT\LCD\IMG_5632.JPG
Design Standards
16
Index 600 Sheet 12Index 600 Sheet 12
16
Longitudinal  Channelizing Devices  (LCD)
Pedestrian  Longitudinal  Channelizing Devices
IMG_4946.JPG
Design Standards
17
Index 600 Sheet 12Index 600 Sheet 12
17
Longitudinal  Channelizing Devices  (LCD)
Pedestrian  Longitudinal  Channelizing Devices
IMG_4947.JPG
Design Standards
18
Index 619 Sheet 1Index 619 Sheet 1
18
Multilane, Mobile Operations Work on Shoulder,Work  Within Travel  Way
plan AM15.png
6-7-2012 2-52-56 PM.png
Design Standards
19
Index 619 Sheet 2Index 619 Sheet 2
19
Multilane, Mobile Operations Work on Shoulder,Work  Within Travel Way
plan AM17.png
Design Standards
20
20
Concrete Barrier SystemIndex 414Concrete Barrier SystemIndex 414
6-7-2012 3-44-46 PM.png
6-7-2012 3-39-36 PM.png
Design Standards
21
21
      Steel Barrier SystemIndex 414      Steel Barrier SystemIndex 414
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\Barrier\Steel\BG800\Susanville Good.jpg
Design Standards
22
22
  Steel Barrier SystemIndex 414 QPL  Steel Barrier SystemIndex 414 QPL
Steel Barrier is alternate design to Type K Barrier!
Design Standards
23
23
TemporaryBarriers
TemporaryBarriers
Index 415 units constructed prior to October 1,2002 may be used until September 30, 2012THROUGH JUNE 30, 2012 LETTING with usage of‘FDOT Snake Pin’ Interconnection
Index 415 units constructed prior to October 1,2002 may be used until September 30, 2012THROUGH JUNE 30, 2012 LETTING with usage of‘FDOT Snake Pin’ Interconnection
415
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
Design Standards
24
24
plan AM2.png
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
Design Standards
25
25
plan AM3.png
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
Design Standards
26
26
plan AM4.png
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
Design Standards
27
27
Concrete Barrier systemIndex 415Concrete Barrier systemIndex 415
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\I-195 092811\D4 and D6 Process Reviews 2011 121.jpg
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\I-595 092911\D4 and D6 Process Reviews 2011 151.jpg
Design Standards
28
28
Concrete Barrier systemIndex 415Concrete Barrier systemIndex 415
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\SR 826 on 092711\D4 and D6 Process Reviews 2011 013.jpg
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\SR 826 on 092711\D4 and D6 Process Reviews 2011 028.jpg
Design Standards
29
29
plan AM5.png
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
Design Standards
30
30
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
6-9-2012 10-42-34 AM.png
Design Standards
31
31
Concrete Barrier SystemIndex 415Concrete Barrier SystemIndex 415
6-9-2012 10-46-27 AM.png
Design Standards
32
Temporary Crash CushionsTemporary Crash Cushions
FDOT Criteria
  VENDOR DRAWINGS
TL-2 (45 mph or less)
TL-3 (50 mph or greater)
  SPEEDS
 Interpolating  at 5 mph increments
Extrapolating for speeds above 60 mph is no longerallowed
32
Design Standards
33
Temporary Crash CushionsTemporary Crash Cushions
FDOT Design Requirements
 Station/Offset
 Type of Crash Cushion (TL-2 or TL-3)
 Speed
 Width - Narrow vs. Wide
 Length Restrictions
 MOT Phase (Temporary)
Use Type K barrier pay item
33
Design Standards
34
34
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\MOT\6-9-2012 11-08-07 AM.png
Crash Cushions (QPL)Crash Cushions (QPL)
Design Standards
35
35
6-9-2012 11-11-46 AM.png
6-9-2012 11-12-55 AM.png
Crash Cushions (QPL)Crash Cushions (QPL)
Design Standards
36
36
Crash Cushions (QPL)Crash Cushions (QPL)
6-9-2012 11-13-24 AM.png
6-9-2012 11-13-46 AM.png
Design Standards
37
37
Crash Cushions (QPL)Crash Cushions (QPL)
6-9-2012 11-04-47 AM.png
Design Standards
38
38
Crash Cushions (QPL)Crash Cushions (QPL)
plan AM18.png
Design Standards
39
39
Crash Cushions (QPL)Crash Cushions (QPL)
D4 and D6 Process Reviews 2011 131.jpg
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\I-75 092811\D4 and D6 Process Reviews 2011 132.jpg
Design Standards
40
40
Crash Cushions (QPL)Crash Cushions (QPL)
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\SR 826 on 092711\D4 and D6 Process Reviews 2011 020.jpg
\\Dotsco370727\sharepublic\Ezzel\ProcessReview\pics\D4 and D6 Process Reviews 2011\SR 826 on 092711\D4 and D6 Process Reviews 2011 019.jpg
Design Standards
41
41
Temporary Crash CushionsTemporary Crash Cushions
Design Standards
42
42
Temp. Signs Mounted on BarrierTemp. Signs Mounted on Barrier
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\MOT\Barrier Sign\6-9-2012 11-52-38 AM.png
Design Standards
43
43
Temp. Signs Mounted on BarrierTemp. Signs Mounted on Barrier
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\MOT\Barrier Sign\6-9-2012 11-53-41 AM.png
\\Dotsco370727\sharepublic\Ezzel\DesignExpo\MOT\Barrier Sign\6-11-2012 8-06-29 AM.png
44
Questions …………..