MRC-inversed
Mekong River Commission Meeting the Needs Keeping the BalanceMRC Water Utilization Programme:GEF International Waters Project(GEF/World Bank)Mekong River Commission Meeting the Needs Keeping the BalanceMRC Water Utilization Programme:GEF International Waters Project(GEF/World Bank)
tonlesap fishing
MRC-inversed
Potentials andChallengePotentials andChallenge
Potentials andChallengePotentials andChallenge
longest riversAt 4,800km long, Mekong is oneof the worldlongest rivers.
ecosystemsBasin supports one of the mostproductive and diverse freshwaterecosystems.
Least spoiled & least developed,and potential for development isfar from utilized.
Only four countries are members.
populationTotal population living in theLower Mekong Basin is atpresent 60 million people => 100million by 2025.
Average flow = 15,000 m3/s, butnot evenly distributed.
Majority of them living belowpoverty line.
BASIN
MRC-inversed
Issues to be addressed byWUPIssues to be addressed byWUP
Issues to be addressed byWUPIssues to be addressed byWUP
1995 Mekong Agreement to address two most importantissues:
water sharing/maintenance of agreed flow level; and
Environment protection and the ecological balance.
Other related issues:
Change of flow regime/quality;
sea water intrusion,
impact on navigation;
Growing demand for water/energy and inter-basindiversion,
Degradation of aquatic ecosystem (fish)
Inadequate knowledge of river basin behavior andwater quality conditions.
MRC-inversed
How Issues/challenges areaddressedHow Issues/challenges areaddressed
How Issues/challenges areaddressedHow Issues/challenges areaddressed
WUP broad objective: set up a mechanism toimplement 1995 agreement by:
Facilitating agreements among countries onrequired set of rules/agreements;
Developing a modeling package and knowledgebase for supporting learnt decision-making;
Capacity building and technical collaboration withupstream countries;
Ensuring ownership and participation.
MRC-inversed
Progress to dateProgress to date
Progress to dateProgress to date
Rules:
Data sharing and exchange agreementsigned in November 2001;
Procedures for Implementing equitableand reasonable use to be signed later thisyear,
By 2005 = three more rules on water usemonitoring, maintenance of water quantity,and quality.
MRC-inversed
Progress to date(Cont.)Progress to date(Cont.)
Progress to date(Cont.)Progress to date(Cont.)
Development ofDecision SupportFramework, andTraining of trainersand end users inprogress  July 03.
Progress toward FlowManagement.
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
The EP and WUP have developed a 3 phaseapproach to flow guidelines
Phase 1  An interim flow plan to preventdeterioration in the short term
Phase 2  A field based comprehensive flowplan
Phase 3  Evaluation of proposedinterventions
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
Interim Flow Plan
Based on existing knowledge
Using an expert panel approach
Deliberately conservative
It will protect bottom lines
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
Interim Flow Plan
Main difficulties :
Collating the existing knowledge
Identifying the bottom lines
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
Comprehensive Flow Plan
Based on field assessments and flowmodeling
Intended to allow prediction of ecological andsubsistence consequences of flow changes
Vegetation zones linked to flood-return periodsVegetation zones linked to flood-return periods
Vegetation zones linked to flood-return periodsVegetation zones linked to flood-return periods
C:\TEMP\tree-0003[1].gif
C:\TEMP\tree-0030[1].gif
C:\TEMP\tree-0003[1].gif
C:\TEMP\tree-0030[1].gif
C:\TEMP\tree-0031[1].gif
C:\TEMP\tree-0031[1].gif
C:\TEMP\tree-0031[1].gif
Back Dynamic
Tree -Shrub
Lower Dynamic
Upper
lower
Wet Bank
Aquatic
580
300
200
120
400
80
50
Q
1:20
1:2
IV
 
II, III
wslf
I
dslf
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
Comprehensive Flow Plan
Main difficulties
Results will provide information to decisionmakers  but not make the decision
Can we effectively model flow over theCambodian floodplains?
MRC-inversed
Flow (discharge)is measured asvelocity crosssectional area but cross sectionarea is difficult tomeasure wherethe river is 50 kmwide!Flow (discharge)is measured asvelocity crosssectional area but cross sectionarea is difficult tomeasure wherethe river is 50 kmwide!
Flow (discharge)is measured asvelocity crosssectional area but cross sectionarea is difficult tomeasure wherethe river is 50 kmwide!Flow (discharge)is measured asvelocity crosssectional area but cross sectionarea is difficult tomeasure wherethe river is 50 kmwide!
C:\Documents and Settings\campbell\My Documents\My Pictures\a42000.jpg
MRC-inversed
MRC and Flow ManagementMRC and Flow Management
MRC and Flow ManagementMRC and Flow Management
Assessment of Interventions
This will involve cooperation between BDP,WUP and EP
  
EP
Ecological &SubsistenceConsequences
BDP
National/ Regional
Macroeconomic
Assessment:
(Hydropower, Irrigation,
Forestry, Fisheries, Other
BDP
Otherstakeholders
Decision Makers
Proposed Interventions
BDP
Options
WUP
Consequences :
Water Quantity & Quality
Define Scope
MRC-inversed
MRC and FlowManagementmeeting the needsmaintaining thebalanceMRC and FlowManagementmeeting the needsmaintaining thebalance
MRC and FlowManagementmeeting the needsmaintaining thebalanceMRC and FlowManagementmeeting the needsmaintaining thebalance
C:\Documents and Settings\campbell\My Documents\My Pictures\picture\enviro15.jpg