Examples include, but are not limited to the following:
i. Loss of operator ability to remotely monitor, control BulkElectric System (BES) elements, or both.
ii. Loss of communications from SCADA RTUs
iii. Unavailability of ICCP links reducing BES visibility
iv. Loss of the ability to remotely monitor and controlgenerating units via AGC
v. Unacceptable State Estimator or Contingency Analysissolutions