Coal Handling for Power Point Template
1
2007 ACC SummerPreparedness Hearing
Tucson Electric Power & UNSElectric
March 22, 2007
Ed Beck
Superintendent
Transmission & Distribution Planning
Leland Snook
General Manager
Wholesale Energy Supply
Coal Handling for Power Point Template
2
Service Territories
San
Juan
Navajo
Palo
Verde
South
Vail
Greenlee
Cholla
Mohave
Mead
Four Corners
Springerville
McKinley
Tortolita
Westwing
Coronado
UES
TEP
Tucson
Liberty
Pinnacle
 Peak
Coal Handling for Power Point Template
3
AZ Power Plant Additions
Coal Handling for Power Point Template
4
AZ Power Plant Additions
Coal Handling for Power Point Template
5
2007 Generation Resources
TEP Generation Resources (MW)
 
 
Steam Generation - Coal
69%
    1,525
Steam Generation - Gas
12%
       267
Combined Cycle - Gas
9%
       187
Combustion Turbine - Gas
10%
       217
Total Generation Resources (MW)
 
    2,196
Market Based Resources (MW)
 
 
TriState Generation and Transmission – Firm PPA
       100
Firm Short-Term Purchases
       250
Spot Market Resources
 
       250
Total Market Resources (MW)
 
       600
Total Generation & Market Based Resources (MW)
    2,796
Coal Handling for Power Point Template
6
2007 Peak Demand Loads andResources
Coal Handling for Power Point Template
7
2007 Generation Preparations
Coal Handling for Power Point Template
8
UNSE Loads & Resources
UNSE under full-requirements contract through 5/31/2008.Load and resource summary provided in APS presentation.
UNSE has been and continues to procure generation resourcesthrough resource acquisition and quarterly request forproposals
To date 100 MW of capacity under firm PPA contracts forSummer 2008
90 MW of capacity under construction at Black MountainGeneration Station located outside Kingman
67 MW of capacity at Valencia Generating Station in Nogales
Coal Handling for Power Point Template
9
Tortolita
South
Vail
Greenlee
Westwing
TEP
Service
     Area
500 kV
345 kV
North Loop
Irvington
Voltage
With Max Local Gen.
Limit of
 1,984 MW
TEP Import PathsTEP Import Paths
Local Gen. 547MW
83
44
420
DMP
Winchester
Coal Handling for Power Point Template
10
Operations preparation
Regional black start drills between control areascurrently taking place
Verification of TEP’s Emergency Operations Center(EOC) readiness scheduled in April 2007
Weekly check of EOC systems occurs
Daily conference call between reliability coordinatorand control area operators to review systemconditions
During summer peak AZ entities hold daily reliabilitycall
New radio system deployed since last summer
Coal Handling for Power Point Template
11
Distribution Preparations
Review and adjust Power Factor as needed
Installation of mobile transformer to support theVail area of TEP service territory until new 138kVsubstation is developed
Coal Handling for Power Point Template
12
UNS Electric Transmission
Mohave  – Transmission from Pinnacle WestDelivery points to UNS loads is provided byWestern Area Power
Santa Cruz load is served at peak with acombination of firm Western transmission andnon-firm transmission supported by localgeneration at Valencia
Coal Handling for Power Point Template
13
UNS Electric System – Santa Cruz
Installed remote control switch at Canezsubstation to allow for operational flexibility
Pre- storm season patrols completed with nomajor items identified for repair
 
Coal Handling for Power Point Template
14
UNS Electric System – Mohave
Installed 2 new Distribution Substations
12 miles of new 69kV line installed
14 miles of new 230kV line (initially operated at69kV)
Pre- storm season patrols completed with nomajor items identified for repair
 
Coal Handling for Power Point Template
15
Conclusion
Sufficient Resources are available to meet TEPload
Sufficient Transmission is available to meet TEPload
Sufficient Transmission is available to meet UESMohave load
Transmission in conjunction with localgeneration is sufficient to meet Santa Cruz load