•M-13 in Pinconning•M-13 in Pinconning
–Low-volume concrete design–Low-volume concrete design
–Reconstruct with 6” of concrete, 6” of dense-graded agg.base, and 12” of sand subbase–Reconstruct with 6” of concrete, 6” of dense-graded agg.base, and 12” of sand subbase
–5.5’ joint spacing in both directions–5.5’ joint spacing in both directions
–No dowel bars at transverse joints–No dowel bars at transverse joints
–Unsealed joints–Unsealed joints
–15 to 20 year expected life–15 to 20 year expected life
•Performing very well•Performing very well
•New cracks at approach to structure at PinconningRiver•New cracks at approach to structure at PinconningRiver