11275_compass_72_rgb
International Accounting Standards Board
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
The views expressed in this presentation are those of the presenters,not necessarily those of the IASB .
Taking stock
As at 31 October 2011
A high level overview of progress on the insurance contracts project
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
2
Where we were:The proposals in the exposure draft
Cash flows
Time value of money
Risk adjustment
Residual margin
The amounts the insurer expects to collect frompremiums and pay out for claims, benefits andexpenses, estimated using up-to-date information
An adjustment that uses an interest rate to convertfuture cash flows into current amounts
An assessment of the uncertainty about the amountof future cash flows
Contract profit (reported over the life of the contract)
Total
insurance
liability
Other matters:  presentation, scope, unbundling and disclosure
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Tentative decisions
No gains at inception
Adjust prospectively for changes in estimates of cash flows
Include independently measured and updated riskadjustment
Adjust for time value of money using rate that reflectscharacteristics of liability
Expected value considering all relevant information
Includes all direct costs incurred in acquiring the contracts
Where we are: high level overview
3
Cash flows
Time valueof money
Risk adjustment
Residual margin
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
What we still need to do
Complete remaining topics
Unbundling of non-insurance components
Residual margin
Presentation
Short duration contracts
Transition
Assess whether any differences between IASB andFASB can be reconciled
Review draft or re-expose
4
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
What’s changed since the ED:overview
Exposure draft
Decisions so far
Definition andscope
No significant change from ED except financialguarantee contracts
To discuss investment DPF
Unbundling
Some changes from ED. On-going discussions
Which cashflows, includingacquisitioncosts
Minor changes in response to comment letters
Recognition point
Contract boundary
Acquisition costs
Discount rate
Some changes in application. No change in principle
Risk adjustment
Minor changes from ED. No change in principle
Residual margin
On-going discussions: unlocking is a significant changefrom ED
5
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
What’s changed since the ED:overview (continued)
Exposure draft
Decisions so far
Participatingfeatures
On-going discussions: minor change from ED
Short durationcontracts
On-going discussions
Reinsurance
On-going discussions: some changes from ED inresponse to comment letters
Presentation
On-going discussions: some changes from ED inresponse to comment letters
Disclosures
On-going discussions
Transition andeffective date
To be discussed
6
11275_compass_72_rgb
International Accounting Standards Board
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
The views expressed in this presentation are those of the presenters,not necessarily those of the IASB .
Details
7
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
* Indicates change from ED proposals
Which cash flows?
8
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Fulfilment cash flows
Expected value of cash flowsincurred in fulfilling the contract,considering all relevantinformation
Confirm use of expectedvalue
+Add guidance that not allpossible scenarios need to beidentified and quantified
Acquisition costs*
Include only acquisition costsincremental at contract level
Include all direct costsincurred in originating aportfolio of insurancecontracts
* Indicates change from ED
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Which cash flows?
9
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Recognition point*
Recognise when insurer isbound or first exposed to riskfrom contract
Recognise when coverageperiod begins
Onerous test before then
Contract boundary*
Ends when insurer:
No longer required to providecoverage or
Can set price that fullyreflects risk of particularpolicyholder
Confirm ED proposal
Add clarification: risk can beassessed at portfolio level insome cases
Some details yet to be resolved
* Indicates change from ED proposals
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Time value of money
10
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Discount rate
Adjusts future cash flows fortime value of money
Reflects only thecharacteristics of theinsurance contract liability
Current and updated eachreporting period
Confirm discount rate
Do not prescribe method
+Add guidance:
‘Top-down’ and ‘bottom-up’ both acceptable
Remove any factors thatinfluence observablerates not relevant to theliability
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Risk adjustment (IASB decisions)
11
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Objective
“The maximum amount theinsurer would rationally payto be relieved of the risk thatthe ultimate cash flowsexceed those expected.”
“The compensation theinsurer requires to bear therisk that the ultimate cashflows could exceed thoseexpected”
Risk adjustment vs composite margin
Include explicit estimate ofthe effects of uncertaintyabout future cash flows.
Measurement of liabilityshould include explicit riskadjustment
Techniques
Restrict techniques that canbe used to determine riskadjustment
No restriction on techniques,as long as technique meetsobjective
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Risk adjustment (IASB decisions)
12
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Disclosure
Disclose confidence levelequivalent
Included in disclosures ofmethods and inputs used todetermine estimates
Confirmed requirement forconfidence level disclosure
Confirm disclosures ofmethods and inputs to beconsistent with thoserequired for other estimates.
+Add requirement to discloseeffect of change in methods
To complete
?    Whether to take account of diversification benefits
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Residual margin (IASB decisions)
13
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Gains at inception
Include residual margin toeliminate gains at inception
Confirm no gain at inception
Residual margin after inception: unlocking*
Residual margin locked-in atinception
Adjust residual marginprospectively for changes inestimates of cash flows(unlocking)
Do not unlock for riskadjustment
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Residual margin (IASB decisions)
14
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposal
Tentative decisions
Residual margin after inception: allocation*
Residual margin allocatedover coverage period
Residual margin allocated:
Over coverage period
On a systemic basis that isconsistent with the pattern oftransfer of the servicesprovided
To complete
?   Whether changes in discount rate adjust residual margin or arerecognised in profit or loss
?   Whether and how to address any accounting mismatches
?   Level of aggregation
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
15
What do these decisions mean?
Cash flows
Time value of money
Risk adjustment
Residual margin
A component representing the obligation toprovide services in fulfilling the contract
Total
insurance
liability
A component representingthe risk-adjusted presentvalue of cash flows neededto fulfill the contract
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
Guidance on applying building blocks
16
Cash flows
Time valueof money
Risk adjustment
Residual margin
ED proposals
Status of discussions
Participating contracts
(Some details tocomplete)
Discount rate reflects dependence ofcash flows on specific assets
Cash flows adjusted to reflect themeasurement basis of the itemsunderlying participation*
Guarantees measured at current value
Reinsurance
(Some details tocomplete)
Confirm  insurer uses same estimatesfor reinsurance asset and underlyingdirect insurance liability
Gains arising from reinsurance contractrecognised over contract term*
Losses arising from reinsurancecontract recognised immediately if forpast events, otherwise deferred*
* Indicates change from ED proposals
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
How to present changes in theinsurance contract liability
Tentative decisions
Line items to show:
Premiums
Claims and expenses
Gross underwriting margin
?Exploring whether somechanges should bepresented in othercomprehensive income
17
17
Risk adjustment
Residual margin
Profit or loss
Net interest and investment
Investment income
Interest on insurance liability
Changes in estimates
Underwriting result
Experience adjustment
x
x
x
x
x
x
x
x
x
x
20XX
ED proposals
Income statement
Underwriting margin
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
What does the insurance contractsstandard apply to?
Tentative decisions
Issues to be resolved
Scope
Confirm proposed definition ofinsurance contract
Confirm most scope exceptionsproposed in ED
Financial guarantee contractsincluded if previously consideredinsurance
Investment contracts withdiscretionary participationfeatures
Unbundling
Unbundle:
Embedded derivatives not closelyrelated to host insurance contract
Using approach from revenuerecognition for:
Goods and services
Some explicit accountbalances
Allocation of fees andcharges
Remaining explicit accountbalances
Permit or require
Prohibit when not permittedor required
18
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
IASB and FASB: Key decisions incommon
Measurement of insurance contract using all cashflows expected to fulfil contract
Cash flows discounted using a rate that reflects onlythe characteristics of the liability
No gain at inception
Presentation that shows information about keydrivers of profitability, including volume information
19
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
IASB and FASB: Differences
Differences so far
Acquisition costs
Treatment of policyholder participation
Explicit risk adjustment, therefore residual margin
Scope – financial guarantee contracts
Further possible differences
Other comprehensive income
Short duration contracts
Investment contracts with discretionary participation features
20
IFRS TM logo_CMYK
© 2011 IFRS Foundation.  30 Cannon Street  |  London EC4M 6XH  |  UK.  www.ifrs.org
21
Stay up to date
Where to find out more
Sign up for our email alert
Project staff:
Andrea Pryde, apryde@ifrs.org
Rachel Knubley, rknubley@ifrs.org
Izabela Ruta, iruta@ifrs.org
Leslie Vermaak, lvermaak@ifrs.org
Joanna Yeoh, jyeoh@ifrs.org
Matthias Zeitler, mzeitler@ifrs.org
Resources
IASB Update
Meeting webcasts
Project podcasts
Investor resources
Effects of boardredeliberations on EDInsurance Contracts
Project timetable