PUBLIC MEETING
November 19, 2003
wtc_water
Lower  Manhattan  Redevelopment
D015183, PIN NYCD.01.322
NYSDOT, REGION 11
Route 9A Project
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECT OVERVIEW
vesey
Vesey Street Pedestrian Bridge
Opening November 22, 2003Completion April 2004
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECT OVERVIEW
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Route 9A Background – Pre 9/11
  NYSDOT – Responsible for 9A
  NEPA/FEIS Design Approval 1994
  Battery Place to West 59th Street
  6 – 8 Lane Urban Boulevard
  8 Lanes in Lower Manhattan       (South of Harrison St.)
  Continuous Bikeway / Walkway / Park-HRPT
  Segments 2 - 7 Almost Completed (1996-2001)
  Segment 1 – Pending
aerial6_01_01_300dpi
BATTERY PLACE
BATTERY PLACE
59TH STREET
59TH STREET
PROJECT OVERVIEW
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Route 9A Bikeway & Walkway
bw1
95% Complete as of September 10, 2001
PROJECT OVERVIEW
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECT OVERVIEW
ped_brdg01
ped_brdg02
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Route 9A Background
pre911_section
 Cross Section at WFC/WTC Sites with Critical Elevations
Slurry Wall
2 NB lanes overSlurry Wall
PROJECT OVERVIEW
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Interim Route 9A Roadway
PROJECT OVERVIEW
interim7_39_03
Verizon Building
Verizon Building
WFC
WFC
Interim Roadway
Interim Roadway
Original Route 9A Limits
Original Route 9A Limits
WTC Site45’+
WTC Site45’+
HaulRoad
HaulRoad
Bikeway
Bikeway
Edge ofslurry wall
Edge ofslurry wall
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
 12,500 People per Hour Crossing at WTC Site, 110,000 per Day   80,000 Vehicles per Day, totaling 240,000 per Day at the WTC Site
 Key Transportation Corridor (Regional and Local)
 Mobility for: Buses, Trucks, Cars, Bicycles & Pedestrians   (almost 40% non-passenger cars)
 Access for: Battery Tunnel, FDR Drive, WTC & Battery Park City &   Westside of Lower Manhattan
 Continuous North-South Boulevard & Greenway    (Route 9A Urban Blvd./Bikeway & Hudson River Park)
 Major Utility Corridor   (78” Interceptor Sewer, 48” Water, 400+ Telephone Ducts)
Importance of Route 9A (Pre 9/11 data)
PROJECT OVERVIEW
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECT GOALS
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECT GOALS
 Permanently restore the functionality of Route 9A
 Improve pedestrian movements along and across Route 9A
 Provide for an appropriate and respectful setting for the   World Trade Center Memorial
 Enhance green areas and open space
 Support economic recovery and development of Lower Manhattan
 Ensure community involvement and public participation in an open and   inclusive process
 Coordinate with other major transportation and development projects
 Avoid or minimize environmental and construction impacts   to the community
 Provide a safe, timely and cost effective transportation solution
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
DRAFT SUPPLEMENTALENVIRONMENTAL IMPACTSTATEMENT
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
1994 FEIS/ROD
DRAFT SUPPLEMENTALENVIRONMENTAL IMPACT STATEMENT
report
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
bat_59_base
bat_59_base
Project Limits
SEIS
SEIS
59th Street
Battery Place
1994 FEIS
1994 FEIS
Chambers Street
West Thames St.
DRAFT SUPPLEMENTALENVIRONMENTAL IMPACT STATEMENT
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
location_map
SEIS Project Limits
No Action – 6 lanesAt-Grade – 8 lanesShort Bypass – 4 depressed &         4 surface lanes
Chambers Street
Chambers Street
W. Thames Street
W. Thames Street
DRAFT SUPPLEMENTALENVIRONMENTAL IMPACT STATEMENT
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PROJECTALTERNATIVES
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Route 9A Alternatives
AT-GRADE8 lanesat WTC Site
SHORT BYPASS4 lanes at grade4 lanes depressedat WTC Site
NO-ACTION6 lanesat WTC Site
PROJECT ALTERNATIVES
lm
lm
lm
Southern Terminus ofBypass beyond AlbanyStreet Under Study
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
no_action_alt_plan
no_action_section
No-Action Alternative
PedestrianConcourse
PROJECT ALTERNATIVES
WTC SITEWTC SITE
€6 lane interim roadway retained at WTC Site
€ Minor improvements to upgrade interim pavement conditions
€ 80,000 vehicles per day at grade
€ No new turn lanes at Liberty and Vesey
€ Pedestrian bridge at Liberty and possibly Fulton and Murray
3
3
3
3
4
4
3 SB
3 NB
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
at_grade_alt_plan
ag_sec
At-Grade Alternative
€ Restore At-Grade Route 9A Blvd
€Enhance 9A Bikeway / HRPT Park
€ Provide Pedestrian Bridges at Liberty, Murray & possiblyFulton Street
PedestrianConcourse
PROJECT ALTERNATIVES
WTC SITEWTC SITE
4
4
4
4
4
4
4 SB
4 NB
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
short_bypass_alt_plan
sbsec
Short Bypass Alternative
PedestrianConcourse
€ 1100 ft Tunnel - Vesey to Liberty Streets or Albany St (4 lanes)
€ NB & SB Surface Roads (4 lanes)
€ Enhanced Green & Public Space at WTC
€ Pedestrian Bridges at Murray Street
€ Relocate Interceptor Sewer
PROJECT ALTERNATIVES
WTC SITEWTC SITE
2
2
2
2
2
2
2
2
2
2
4
2 SB
2 NB
2 SB
2 NB
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
SOCIAL, ECONOMIC ANDENVIRONMENTAL CONSIDERATIONS
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Scope of Environmental Analysis
The DSEIS will update studies performed in the 1994 FEIS andadditional analysis as needed:
SOCIAL, ECONOMIC AND ENVIRONMENTALCONSIDERATIONS
 Land Use and Neighborhood Character
 Social Conditions
 Economic Conditions
 Cultural Resources
 Parkland / Open Space / 4(f)
 Visual Character
 Traffic
 Pedestrians and Bicyclists
 Public Transportation
 Air Quality
 Noise
 Contaminated Materials
 Impacts during Construction / Cumulative Effects
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
Environmental Analysis Framework andEnvironmental Performance Commitments
SOCIAL, ECONOMIC AND ENVIRONMENTALCONSIDERATIONS
 Joint letter to FTA signed by NYSDOT Chief Engineer, MTA ExecutiveDirector and Port Authority Executive Director
 Framework consists of four components:- Green Design,  Green Construction and Sustainability Principles- Construction Environmental Protection Plan- Public Involvement and Government Entities Coordination Plan- Baseline Assessment of Resources and Coordinated Cumulative                 Effects Analysis Approach
 Agencies have agreed to develop a common set of EnvironmentalPerformance Commitments, which are design elements, constructiontechniques or operating practices that will be implemented to lower thepotential for adverse environmental impacts
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
SOCIAL, ECONOMIC AND ENVIRONMENTALCONSIDERATIONS
Traffic
 WTC Memorial visitors
 WTC Site Master Plan
 2025 Population and Employment Forecasts
 Updated Traffic Model
 More Refined Impact Assessment Tools
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
SOCIAL, ECONOMIC AND ENVIRONMENTALCONSIDERATIONS
Construction Impact Assessment
 SEIS will be quantitative and detailed
 Assessment will focus on- Historic/Cultural- Traffic Circulation and Access- Air Quality- Noise Impacts- Economic Impacts of Construction Operations
 SEIS will include Environmental Performance Commitments to   minimize adverse effects
 Environmentally Friendly Construction Techniques
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
SOCIAL, ECONOMIC AND ENVIRONMENTALCONSIDERATIONS
Cumulative Effects Analysis
 SEIS – Detailed Quantitative Assessment
 Federal/State Transportation Agencies have Developed   Environmental Framework for Analysis
 Take into account effects of major projects that precede or areconcurrent (with Route 9A Reconstruction)
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
SEIS Schedule
DRAFT SUPPLEMENTALENVIRONMENTAL IMPACT STATEMENT
nepa
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
PUBLIC OUTREACH
Route 9A Project
Lower Manhattan Redevelopment
nysdot_ppt
9a_office_ppt
New York State Department of TransportationRegion 11
news2
PUBLIC OUTREACH
news