1
Presented to ERCOT
Retail Market Subcommittee
January 9, 2002
Profiling Working Group
Darryl Nelson, Chair
Load Profiling Operating Guides(LPOG)
2
Sections of LPOG Approved by RMS:
 Change Control Process for LPOG (3)
 Validation of Load Profile IDs (10)
 Requests for Changes to Profile Segment Definitions (11)
 Requests for Changes to Weather Zone Definitions (12)
 Load Profile Dispute Resolution Process (13)
Summary of Approved Sections
3
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
4
Brief Overview
  Part of Settlements
  15-minute intervals
  Non-IDR customers
  Created in fair and equitable manner
Purpose of Load Profiling
5
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
6
Background
  More detail for principles listed in Protocols 18.2.1
  Part of Load Profiling Methodology document, v1.04
 Approved by PWG in May 2000
Guidelines for Load Profile Development
7
Guidelines
  Minimize total number of load profiles by leveragingexisting load research data
  Incorporate generation cost data into analysis todetermine appropriate number of load profiles
 Suggested issues to be addressed when assigning loadprofiles to areas that do not currently have loadresearch data
(cont’d)
Guidelines for Load Profile Development
8
Guidelines (cont’d)
  Use readily identifiable parameters to assign loadprofiles
  Use most accurate load research data available
 Possible methods to accommodate Time-of-Use,controlled loads and other similar demand-sidemanagement programs.
 (cont’d)
Guidelines for Load Profile Development
9
Guidelines (cont’d)
  Load profile information shall be consistent, clear,easy to understand, and readily available.
  Load profile methodology shall be fully andunambiguously defined.
Guidelines for Load Profile Development
10
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
11
Introduction
ERCOT Board approval is necessary for any changefrom one load profile methodology to another.(Protocols 18.2.9)
This section does not address changes to profilesegments or weather zones.
A request for a load profile methodology change willnot be accepted until 2 years after market open.
Changes to Load Profile Methodology
12
Current Methodologies
  Adjusted Static - Residential and Commercial
  Engineering Estimates - street lighting and otherconstant loads
  Proxy Day - estimating IDR loads
  Lagged Dynamic Sampling - Direct Load Control
Changes to Load Profile Methodology
13
Who May Submit
Any market participant, Profiling WG, or ERCOTmay submit a request to change a load profilingmethodology.
Changes to Load Profile Methodology
14
Timing
  No requests accepted for 2 years
  Submitter of a request will be notified within 2business days by ERCOT of receipt of request andinform submitter of next PWG meeting dates.
  Submitter will present request at next PWGmeeting.
Changes to Load Profile Methodology
15
Timing (cont’d)
   After request has been presented, ERCOT willrespond within 60 days to address these issues:
- Completeness of request
- Additional data, if needed
- Assessment criteria
- Estimate of time to evaluate request
- Estimate of time to implement request
  A methodology change will only be implementedwith Board approval and at least 12 months notice tomarket participants.
Changes to Load Profile Methodology
16
Information Required with Request
   State why a change is necessary, why the proposedmethodology is superior to current, and how thebenefits of change outweigh costs to implement.
  Supporting data, such as:
- Analysis of data available in ERCOT systems
- Analysis of load research data not available to  ERCOT
- Other data or supporting evidence
Changes to Load Profile Methodology
17
Evaluation of Request
ERCOT will evaluate the request for change tomethodology using these factors:
  Quality of supporting data
  Magnitude of differences
  Size of affected load profile population
  Effect on rest of market if change is accepted
Changes to Load Profile Methodology
18
Approval of Request
Ultimate approval by ERCOT Board after followingproper approval sequence through appropriate TACsubcommittees and TAC.
Changes to Load Profile Methodology
19
Costs for Methodology Changes
The submitter of request will pay all costs associatedwith developing supporting data and documentation.Also, ERCOT may charge a processing fee forevaluating the request.
Costs for implementing changes to ERCOT systemswill be borne by ERCOT.
Changes to Load Profile Methodology
20
Procedure for Submitting a Request
  Submit request to ERCOT
(All materials in electronic format only)
  Present request to PWG
  PWG, ERCOT, and submitter will jointly reviewrequest
  PWG and ERCOT will determine any additionalsupporting data needed from submitter to evaluaterequest.
Changes to Load Profile Methodology
21
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
22
Types of Evaluations
  Routine
ERCOT will perform annual evaluations
  Interim
Request for model performance evaluation frommarket  participant, TAC subcommittee, orERCOT.
Profile Models
23
Implementation of Model Changes
 Any changes based on annual and interim evaluationswill be implemented together as part of the annualimplementation of changes (including changes toprofile segments and/or weather zones), unlessevaluation determines a need for a more immediatechange.
Profile Models
24
Types of Profile Models
Adjusted Static Model
  Most profile segments are adjusted static
  Regression
  Based on load research, weather, and calendar
Engineering Estimates
  Non-metered:  lighting and flat
  Assume same operating schedule and same load
  Sunrise/sunset effect on lighting
Profile Models
25
Evaluations of Adjusted Static
With Current Load Research Data
  Best data for comparison/evaluation
  Factors for Comparison
Load-weighted average price
On/Off Peak ratio
Load factor
Summary statistics on difference in series
Deadweight loss
Without Current Load Research Data
  Old load research data
  Monthly consumption data
Profile Models
26
Evaluation of Engineering Estimates
  Evaluate any new operating schedules
  Evaluate any new load information
  Compare monthly consumption data
Profile Models
27
Routine Evaluations
  Compare existing profile model with profile basedon load research data
  Consider any end-use saturation data
  Consider any current data useful for engineeringmodels
  Review magnitude of load migration
  Compare aggregate monthly consumption data withprofile model
  Evaluate weather zone definitions for adequacy ofweather stations and weighting
Profile Models
28
Interim Evaluations
Same as Routine Evaluation except attention will belimited to those profile segment models and weatherzones that are of concern.
Profile Models
29
Assessing the Type of Change Needed
Profile Models
Possible Recommendations
  Adjust coefficients for one or more profile segments
  Re-estimate models
  Begin to collect new load research data
  Implement changes to weather zone(s)
  Implement changes to profile segment(s)
  No change
30
Assessing the Type of Change Needed
Qualitative Criteria
Determine if serious bias is present
Determine degree of bias, e.g. modest, extensive
Implement necessary actions to rectify bias problem:
Adjustment factors
Change definition of weather zone(s)
Limited load research program
Adjust coefficients
Re-estimate models
Profile Models
31
Criteria for Requiring a Change
  No criteria at this time.
  Criteria might be established after the first annualevaluation is complete.
Profile Models
32
Procedures for Making a Change
  Approval by the appropriate TAC subcommittee
  Implement changes to Adjusted Static:
  Adjustment factors
  Model Re-estimation
  New engineering estimates
  Changes will occur annually unless requiredimmediately
Profile Models
33
Requesting a Change to Models
Procedures
  General info
  Model adjustment factors
  Analysis of data in ERCOT systems
  Analysis of load research data not available toERCOT
  Analysis of other supporting data
  Engineering estimates
  Re-estimation of Models
Profile Models
34
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
35
General Info
ESI Ids with demand meters are assigned a LoadProfile type based on average annual load factor.  Tocalculate load factor, a demand in kW is needed.
If kVa is metered instead of kW, then the TDSP mustdetermine the appropriate power factor(s) that shouldbe used for the conversion.
This conversion from kVa to kW is used only forassigning the proper load profile type to each ESI ID.
kVa to kW Conversion
36
Applicable Market Participants
This section applies to any market participant such as:
  TDSP who currently meters kVa
  TDSP who changes from kW to kVa metering
  NOIE that decides to opt-in
  New competitive metering market participant
kVa to kW Conversion
37
Procedure
  TDSP will conduct a case study to determineappropriate power factor(s) to be used in conversion.
  TDSP will submit case study to ERCOT
  PWG will meet within 30 days of submittal to review
  If PWG approves, then sent to RMS, TAC andBoard for approval as appropriate.
  TDSP implements approved power factor(s)conversion for load profile ID assignments.
kVa to kW Conversion
38
Power Factor Performance Review
 TDSP must periodically review the performance ofthe power factor(s) at the discretion of ERCOT or thePWG.
kVa to kW Conversion
39
Other Issues
ERCOT and the PWG will specify minimal reportingstandards for power factor analysis to each requestoron a case-by-case basis.
Without approval of the case study, a default powerfactor of 1.0 shall be imposed.
kVa to kW Conversion
40
Approval of Approach for 6 sections:
 Purpose of Load Profiling (1)
 Guidelines for Load Profile Development (4)
 Request for Changes to Load Profile Methodology (6)
 Request for Changes to Load Profile Models (7)
 kVa to kW Conversion (9)
 Access to Load Profiling Materials (17)
Goal for Today
41
Daily Load Profiling Market Info
Access to Load Profiling Materials
  Backcasted (Actual) Load Profiles
  Forecasted Load Profiles
42
Load Profiling Documents
Access to Load Profiling Materials
  Profile File Format
  Profile Decision Tree
  Profile Model Spreadsheets
  Final Profile Model Report
  Load Profile History
  Historical Weather Data by Weather Zone
  Profile Types and Weather Zones
  Profile Data Evaluation Report
43
Other Materials
Access to Load Profiling Materials
Calendar of Events
   Provides information on the PWG meetings
Profiling Working Group Meeting Info
  Will contain information similar to Calendar of Events,
  but in a more accessible form.  Incomplete (gray boxed)