1
MICE Hall Layout
MICE Collaboration Meeting,  LBNL,  February 12, 2005
Paul Drumm
for
Yury
& the RAL team
2
 Hall layout
 Beam line shielding layout
 PSI solenoid infrastructure layout
 Plans
 Access to MICE & ISIS running
Scope
3
Layout (plan view)
MICE- Experimental-Hall-Layout001-sht1-issueT-stage6
Drawing by Tony Jones
4
Layout (elevation view)
Stage6Elevation
Drawing by Tony Jones
5
Layout (cross-section view)
Drawing by Tony Jones
stage6Crosssection
6
MICE module max height
Door
Concrete aperture
Important: The max height from the bottom of the frame to the top
of a module should not exceed   3200  mm
Concertina door
Hinged door
Max opening 3200 mm
Max opening 3360 mm
7
MICE and beam line shielding
 Consultations with ISIS Radiation Safety Officer:
        Implemented:
 Beam line radiation shielding:
- Roofed block house;no
- Labyrinth –type entrance;yes
- 1.5 m of steel + 0.75 m of concrete in the direction of the beam;yes
     - Temporarily shielding block (1.5 m of steel + 0.75 m of concrete)yes
        + 1 m of concrete (very recent demand));not yet
- Beam stopper.Yes(!)
MICE radiation shielding:
- Shielded doorsyes
- Room for possible shielding for ISIS ion source hall;yes
- Room for possible shielding for ISIS control room yes
8
Beam line shielding layout
Beamline
Shielding:
Steel – 1153 tonnes
Concrete – 146 tonnes
Existing shielding
New shielding:
Steel
Movable steel
Concrete
9
Solenoid in test position
Temporary shielding block
BeamlineShielding
10
MICE and beam line shielding: Problems and solutions
Problem:
Very heavily shielded beam line  high cost  can MICE afford it ?
 But do we really need that heavy shielding ?
Solution:
Calculate doses in the MICE hall for the worst scenario case
Optimize the shielding
Discuss the issue again with ISIS Safety Officer
11
PSI solenoid infrastructure
 Magnet preparation for shipment :
        - New nose piece and temporary lead shielding
          (design completed).
        - Need to agree few technical issues for
          transport with PSI.
 Cryogenics
- layout (suggested)
- specs   (ready)
 Site for compressor  (suggested)
 Support structure      (conceptual design completed)
12
PSI solenoid nose piece
Mu-Kanal-2 mit Wagen
Nose piece to be replaced
New temporary lead
cover to be added
13
PSI solenoid nose shielding cover
td-1063-020_LeadCover
Drawing by Matthew Hills
14
PSI solenoid cryogenics layout
BeamlineShielding
He Transfer lines
He Refrigerator
Compressor
15
PSI solenoid support structure and shielding
PSI Superconducting Solenoid
01 Mu-Channel Overview from right
18 cast iron shapes for the shielding
ConcreteISISwall
Steel
shielding
16
Hall Layout: Plans
 Finalize shielding layout
(after the agreement with ISIS Radiation Safety Officer is reached)
 Add RF system infrastructure
 Modify layout for hydrogen system
 Add new support system (talk by Elwyn)