Stick Mann
Remodeling a Bathroom
My Background
Interested in construction from a young age
Took 5 sections of woodshop in high school
Future Implications
Attending Stick Building University this fall
Majoring in Construction Technology
Would enjoy owning a construction company
Identifying the Project
Upgrade desperately neededfor the guest bathroom inmy parent’s house
Water damage from the sink,shower, and toilet
Complete demolition andrebuild
Removal of moldy materials
Reframing the room andchanging the dimensions
Identifying the Project Continued…
Needs a tile floor (includingsub floor)
Updates necessary forheating ducts
New PEX plumbing neededthroughout
New sink, shower, andtoilet
Complete redo ofelectrical, sheetrock, andpaint
Skills I Needed to Learn
Demolishing andremoving materials
Framing a room
Plumbing with PEX pipeand fittings
Inserting junctionboxes, rewiringoutlets/switches, andlights
Skills Continued…
Installing a sink, toilet, andone piece shower/bath
Tiling
Hanging sheetrock, taping,texturing, and painting
My Timeline
September 2010:  ask Sticky Stickmasterson to be my mentor
October 2010:  complete my research paper—with help from the Internet, How-toBooks, and Sticky Stickmasterson
November 2010:  meet with Sticky and then begin demolition
December 2010:  complete 30 hours of work—fixing the duct work and replacingthe subfloor
January 2011:  meet with Sticky—have him help me with framing, plumbing,installing tub, and completing electrical—30 more hours of work
February 2011:  install the tile floor, grout, caulk,  sheetrock, tape, and paint—Sticky will guide me throughout this process—another 30 hours of work—theproject should be complete!!!
My Mentor
Sticky Stickmasterson
Asked in July to be mymentor
General Contractor
35 years of experience
Willing to meet with me 2xa month
Professional Bodybuilder
The Project Begins…
Met with Sticky in late October
Began demolition on bathroom
More Demolition Pictures
Subfloor Install
Completed this inDecember withSticky’s help
Repaired duct work,re-routedelectrical/plumbing
Reinsulated andretrofitted joists asneeded
Framing
Sticky helped me with plumb, level, and 16inch centers
Learned how to use a nail gun
Shower/Tub Install with Plumbing
Toilet and Sink Installation
Tiling
Laid downmembrane
Installed cementboard
Cut tile with astraight cutter, saw,and snippers
Applied grout andseal
Sheetrock, Taping, Texture, and Paint
Hung green board
Applied a membrane
Taped and sprayed texture
Painted a caramel color
Completed Project
Completed date was February 28, 2011
More Pictures of Completed Project
Conclusion
New Learning:
Framing, tiling, plumbing, electrical, duct work,sheetrock, texturing, and painting
What this means for me:
Jump start for college
Be able to work construction jobs to make extramoney
Ability to remodel my own home
Thank you for listening to my presentationabout remodeling my bathroom.
Questions…